Visiting timetable10:00 AM09:00 PM
Tuesday, January 27, 2026
Fondation Louis Vuitton, 8 Avenue du Mahatma Gandhi, 75116 Paris, France
Back to architecture
construction

Fondation Louis Vuitton Construction: A Technical Narrative

A behind-the-scenes view of timber arches, steel joints, and glass sails at the Fondation Louis Vuitton.

1/21/2026
19 min read
FLV wood arches detail

Wood Arches Steel Joint Internal Roof

Overview

Inside the making of the Fondation Louis Vuitton: wood arches, steel joints, glass sails—coordination at architectural and craft scales.


Phasing Table

Phase Scope
Foundations Substructure, services
Timber Arches Fabrication, erection
Steel Ribs Connection + stability
Glass Sails Panelization + install

Note: Digital coordination aligned shop drawings with on-site tolerances.

Field Notes

  • Tolerances refined per interface.
  • Crane lifts sequenced to reduce rework.
  • Test panels validate color livery.

Craft & Computation

  • Cardboard/wood models inform digital rationalization.
  • CATIA coordinates complex joints and ribs.

Checklist

  • Verify tolerances at each interface.
  • Sequence lifts to reduce rework.
  • Align livery with test panels.

About the Author

Paris Culture Desk

Paris Culture Desk

I wrote this guide so your visit to the Fondation Louis Vuitton feels calm, curious, and well‑timed—without missing what makes Gehry’s building so special.

Tags

Fondation Louis Vuitton
Construction
Engineering

Comments (0)

Leave a Comment

Loading comments...